The final phase of the Pativilca-Trujillo project in Peru

By request of the company Autopista del Norte, Tecsidel began the last phase of the Toll System implementation in Red Vial 4: Pativilca-Trujillo, located in Panamericana Norte, in the northern coast of Peru. This phase consists of the supply, installation, commissioning and maintenance of the toll collection system at the Fortaleza and Huarmey plazas.

It includes a total of 12 lanes, 6 per toll plaza. The manual toll collection system will be installed in the lane (level 1), integrating it with the existing plaza system (level 2) and back office (level 3). Considering the addition of the plazas of the first phase (Virú and Vesique), the project will be completed with the commissioning of a total of 4 plazas and 23 lanes.

The company Autopista del Norte is the concessionaire responsible for the construction, operation and maintenance of the Pativilca-Trujillo highway. The scope of this project has a length of 396.21 km and longitudinally connects the Lima, Ancash and La Libertad regions. For more information: www.aunor.pe.